Skip to main content

SEO risk register

How to use it​

  1. Read the exposure score and its four bands. The bands tell you which dimension is driving it.
  2. Work the list in priority order. It is already ranked across all four sources.
  3. Assign items to the person who will fix them.
  4. Watch the trend for whether the score is actually moving.

⏱ Weekly review · 💳 Starter+ · 🎯 One backlog, honestly counted

What feeds it​

SourceWhat counts as an itemPriority rule
Crawl issuesFindings from your most recent completed crawlThe crawler's own severity, with info collapsed to low
Broken linksOpen broken links found on your site5xx is critical; a 4xx is high only when it demonstrably costs something — attributed revenue, organic clicks or real 404 hits; otherwise medium
Keyword riskTracked keywords carrying a risk flagSet by the keyword risk sweep
SLA breachesItems past their due dateEscalated

The broken-link rule is worth understanding. A dead URL nobody visits and nothing links to is a housekeeping item. A dead URL with organic clicks against it is lost revenue. Grading both as "broken" produces a list where the important row is buried behind two thousand unimportant ones.

Source rows, not work items​

The register reads the source tables and treats assignment and resolution as an overlay on top of them.

Why this matters

Work items in this suite are created lazily — a row exists only once a human assigns, snoozes or resolves something. A register that queried work items therefore reported "all resolved" on a store with thousands of open crawl issues and broken links, because nobody had triaged any of them yet.

Reading the sources means the register reflects reality on day one, and matches what the Crawler and Broken links tabs already show you.

An item leaves the register when its overlay reaches a terminal state — resolved or dismissed. Anything else, including no overlay at all, leaves the underlying row live in the register.

Assignment is mirrored back to the source row, so an item you own here does not appear unowned on the tab it came from.

The exposure score​

The score is 0–100, built from four capped bands:

BandContributionReaches its cap at
Critical crawl and link issuesup to 4010 issues
High crawl and link issuesup to 2020 issues
SLA breachesup to 205 breaches
Keywords at riskup to 2020 keywords

Capping each band is the point. An uncapped formula against a real technical backlog — a live store carries thousands of open crawl issues — pins at 100 on the first crawl and never moves again, which tells you nothing. With bands, each dimension retains visible headroom and the score responds to work you actually do.

One-time step in the trend

Snapshots written before August 2026 used an earlier, uncapped formula. The exposure trend therefore has a single step at the changeover. Comparisons after that point are like for like.

Scoping and counting​

  • Crawl issues are scoped to the latest completed crawl. Issues are regenerated on every crawl, so summing across jobs counts the same problem once per crawl that found it.
  • Suppression rules are applied in the query, not after fetching, so counts over a 50,000-issue crawl are exact rather than exact-over-the-first-page.
  • Truncation is disclosed. When the list shows the worst N of a larger set, it says so.
  • An empty register explains itself. "No crawl has completed yet" and "no risks found" are different states and are shown differently.
  • A section that failed to load shows a banner, not a zero. A failure that renders as zero is indistinguishable from good news.

Trend​

The register snapshots itself daily, so the exposure score plots over time. A trend line needs at least two points — a store that has only ever taken a manual snapshot will see the chart appear on the second day.

Plan tiers​

CapabilityFreeStarterProAgencyEnterprise
Unified register across all four sources—✓✓✓✓
Exposure score + band breakdown—✓✓✓✓
Assignment and resolution—✓✓✓✓
Suppression-aware counts—✓✓✓✓
Daily exposure trend—✓✓✓✓
Keyword revenue risk band——✓✓✓

Keyword revenue risk depends on the Search Console connection and the keyword scoring pipeline.

Best practices​

  • Work critical before quantity. Ten critical issues cap a band that two thousand medium ones cannot touch.
  • Assign, do not just resolve. An unassigned item that breaches its SLA still counts against you, and there is no way to dodge that by leaving it unowned.
  • Dismiss with a reason. A dismissal is a decision you are recording; six months later the reason is the only thing that makes it reviewable.
  • Re-crawl before declaring victory. The register reflects the last completed crawl — fixes are invisible to it until the next one runs.
  • Check the trend monthly. Day-to-day movement is mostly crawl variance.

See also​